Services
Services organised around the Kenyan approval path.
Most clients do not begin by knowing the exact engineering service they need. They begin with a building, road, site, county instruction, tender requirement, donor programme, or construction problem that has to pass technical and statutory review.
In Kenya, the approval route is what makes an engineering service compulsory rather than optional. A building cannot go up until the county grants development permission against architectural and structural drawings prepared and signed by registered consultants (Physical and Land Use Planning Act, 2019; Engineers Act, 2011). Before the contractor can break ground, the project must also be registered with the National Construction Authority (NCA), which checks for those same signed drawings and a registered contractor (NCA Act, 2011). And any project on the Second Schedule of the Environmental Management and Coordination Act (EMCA), or otherwise likely to have significant environmental impact, must clear a National Environmental Management Authority (NEMA) assessment before any other licensing authority can issue its own approval.
The firm helps clients understand which engineering inputs are needed before committing to design, tender, construction, or compliance submissions.
Structural Engineering
Reinforced-concrete and structural-steel design for high-rise, institutional, and public buildings.
Open → 02Geotechnical
Site investigation, foundation options, retaining structures, and ground-improvement design.
Open → 03Transportation
Roads, bridges, rural access, and abnormal-load freight routes for outsize components.
Open → 04Planning & Feasibility
Master planning for estates, industrial parks, and SEZs; feasibility studies and project appraisal.
Open → 05FIDIC Supervision
Contract administration and construction supervision under FIDIC Red Book and Yellow Book conditions.
Open → 06EIA & Environmental
Environmental and Social Impact Study, environmental audit, OSH plans, and safeguards alignment.
Open →Evaluating a consultant for a public, donor-funded, or commercial commission?
Capability statements, the tax-compliance certificate, PIN, and Professional Indemnity cover are supplied with every tender response.